
Journal Menu
In this paper a gas condensate reservoir with 33Gscm initial gas in place with total production of 15.8Gscm from 7 producers within 19 years production history is studied. The result of simulation study shows the reservoir can be appropriate candidate for underground gas storage execution. The result of the study also shows gas injection in the reservoir, significantly prevents condensate loss. It is also possible to inject 20MscmD in 8 months and produce 40MscmD in 4 cold months. The model is well fitted with 95 percent level of confidence